Ingo started following the work of Silver Meikar.
Ingo started following the work of Maili Lehtpuu.
Ingo added 10 papers
- 3D GIS
- Earth Sciences
- Environmental GIS
- Environmetal Earth Science
- GIS
- Geographic Information Systems
- Geology
- History of Mining
- Information Technology and Economics
- Mine Closure Planning
- Mine Planning
- Mine Water
- Mine backfilling
- Mineral Processing
- Minerals
- Mining
- Mining Engineering
- Mining History
- Mining Policy
- Natural Resources
- Oil Shale
- Optimal mine design and scheduling
- Remote Sensing
- Remote sensing and GIS applications in Landscape Research
Papers
KAEVANDUSVEE KASUTAMISE POTENTSIAAL SOOJA TOOTMISEKS
Kaevandused suletakse, kui enam ei ole võimalik kaevandada. Aja jooksul täituvad kaevandused
veega, moodustades allmaabasseinid. Suletud põlevkivikaevanduste vee kasutamise võimaluste
hindamine soojusenergia allikana on muutunud aktuaalseks seoses infrastruktuuri muutumisega
kaevandusasulates. Käesolevas artiklis on vaatluse all soojusenergia kasutamise potentsiaal ja
võimalike kasutamiskohtade näited. Kasutamise otstarbekuse analüüsi teostamiseks on
peamisteks kasutatavateks meetoditeks arvutusmudelid ning GIS (geoinfosüsteemi) andmete
analüüs. Tehnogeense veekogumi kasutamise hindamiseks tuleb arvutada võimalik vee maht, vee
vooluhulk ja analüüsida võimalikke kohti veevõtuks, vee pumpamiseks või soojuspumba
paigutamiseks. Analüüsiks on otstarbekas koostada mäenduslik geoinfosüsteemi mudel, milles
sisaldub kivimikihtide ja maapinna geomeetriline mudel, kaevanduse tehnoloogiline ruumiline
mudel ja vee voolu hüdrogeoloogiline dünaamiline mudel. Mudeli abil simuleeritakse vee
pumpamist soovitavatest kohtadest. Analüüsi tulemusena saab väita, et suurtarbijana on kõige
potentsiaalsem rajada soojuspumpjaam Ahtme soojuselektrijaama juurde, et vajadusel kasutada
olemasolevat kompleksi vee temperatuuri tõstmiseks soovitud temperatuurini kui soojuspump ise
seda ei võimalda [8]. Sellisel juhul on kaevandusveena kasutatav kuni 28 mln m3 Ahtme
kaevanduse põlevkivikihindis olevast veest [6]. Optimaalsel režiimil toodaks soojuspumpjaam 10
MW soojust, kasutades selleks kaevandusvett 2151 m3/h ning soojuspumpjaam vajaks selleks 3,3
MW elektrienergiat. Pilootprojektina avatakse soojuspumpjaam Kiikla asulas, mis hakkab tootma
500 kW soojust. Soojuspumpjaamu saab rajada samuti teistesse suletud põlevkivikaevanduste
piirkondadesse, kus on olemas kaevandusvee kasutamise potentsiaal, näiteks Kose asula, Estonia
kaevanduse tootmiskompleks jt kohad. Kaevandusvee kasutamine soojuspumba soojusallikana on
uudne ja järgib säästva arengu printsiipe. Tegeliku tulemuslikkuse ning majandusliku otstarbekuse
näitab ära Kiiklas alustav pilootprojekt.
QUALITY CONTROL OF OIL SHALE PRODUCTION IN ESTONIAN MINES I VALGMA, E REINSALU, S SABANOV, V KARU Journal: Oil Shale , vol. 27, no. 3, 2010 DOI: 10.3176/oil.2010.3.05
QUALITY CONTROL OF OIL SHALE PRODUCTION IN ESTONIAN MINES
I VALGMA, E REINSALU, S SABANOV, V KARU
Journal: Oil Shale , vol. 27, no. 3, 2010
DOI: 10.3176/oil.2010.3.05
QUALITY CONTROL OF OIL SHALE PRODUCTION IN ESTONIAN MINES
I VALGMA, E REINSALU, S SABANOV, V KARU
Journal: Oil Shale , vol. 27, no. 3, 2010
DOI: 10.3176/oil.2010.3.05
Mining of Oil Shale
I Valgma… - eolss.net
Keywords : Aboveground mining ,Arm loader, Baltic oil shale, Blasting, Braking, Double
handling, Double unit face method, Dragline, Drifting, Drilling, Fushun Open Pit Mine, Green
River oil shale, Kukersite, Longwall mining, Magnetic suspension, Maoming mining area, ...
I Valgma… - eolss.net
Keywords : Aboveground mining ,Arm loader, Baltic oil shale, Blasting, Braking, Double
handling, Double unit face method, Dragline, Drifting, Drilling, Fushun Open Pit Mine, Green
River oil shale, Kukersite, Longwall mining, Magnetic suspension, Maoming mining area, ...
7 views
Seen by:1 views
INFLUENCE OF WATER DISCHARGING ON WATER BALANCE AND QUALITY IN THE TOOLSE RIVER IN UBJA OIL SHALE MINING REGION
Published in Oil Shale. http://mi.ttu.ee/oilshale/
The extraction of mineral resources below the groundwater table is related to
water removal from surface and underground mines. Water drainage is considered the main process for keeping mining sites dry or suitable for mining.
Parameters of depression cone and its impact radius are factors influencing
decision makers. Water collection system, pumping station and sedimentation
ponds are the main tools for water drainage. The quantity of drainage water
depends on the amount of precipitation, surface water, soil water and
groundwater. Water table in wells, the amount of pumped-out water and the
amount of water in the Toolse River have been measured from 2005 to 2009,
and chemical components in river water have been analysed. Analyses have
shown that water is often repumped from the mining sites. Operating surface
mines in the Ubja region act as water reservoirs. Accumulated water is
directed to the Toolse River increasing its flow. Quality indicators in the
Toolse River of the Ubja region are in accordance with water normatives
except total P content downstream the Toolse River.
4 views
Seen by:
